African Mining Brief
  • Home
  • Events
  • Industries
    • Energy
    • Equipment
    • Fuel and Fleet Management
    • Legislation
    • Mining
    • Products
    • Technology
    • Water
  • People
  • Insights
  • Videos
  • Advertise
  • Magazine Archive
  • Blog
No Result
View All Result
  • Home
  • Events
  • Industries
    • Energy
    • Equipment
    • Fuel and Fleet Management
    • Legislation
    • Mining
    • Products
    • Technology
    • Water
  • People
  • Insights
  • Videos
  • Advertise
  • Magazine Archive
  • Blog
No Result
View All Result
African Mining Brief
No Result
View All Result

Power Outages Cost Zimbabwe Businesses $200m Weekly

Jimmy Swira by Jimmy Swira
August 12, 2019
in Zimbabwe
0
Power Shortage Looms As Kariba Dam Dries Up Due to Drought

The low level of Kariba Dam has resulted in loadshedding (pic: Bulawayo 24)

By Kitsepile Nyathi

Harare — On July 20, making a call on Zimbabwe’s biggest mobile phone network, Econet, was almost impossible as its services were down.

“Our generators failed to kick-in following a Zimbabwe Electricity Supply Authority (Zesa) power outage, resulting in an automatic system shutdown to protect critical network operations centre equipment,” Econet said.

POWER RATIONING

Econet is just one of the businesses bearing the brunt of perhaps Zimbabwe’s worst power shortage in history, which has seen Zesa, the power utility, ration electricity supply for up to 18 hours daily. This is taking a toll on businesses which have to rely on diesel, a rare commodity with erratic pricing in Zimbabwe, for their operations. The price of diesel has jumped from $1.38 in January to about $7.50 at the end of July.

Econet, owned by billionaire, Strive Masiyiwa, has warned that it may have to resort to “drastic measures” after incurring the cost of buying and ferrying two million litres per month of diesel to power its base stations. The company estimates it requires 12 million litres of diesel to provide uninterrupted service but the fuel is not readily available.

In May, Zimbabwe significantly reduced electricity generation at its biggest hydro plant after water levels at Kariba Dam dropped significantly. The Kariba Power Station, which was already operating at half capacity, reduced generation to 358MW from 542MW.

Zimbabwe is only producing about 1,100MW against peak demand of 2,200MW. The country cannot import electricity because it owes South African and Mozambican power utilities $80 million.

Thursday, Harare increased electricity tariffs for domestic consumers threefold to three US cents in a mid-term budget review. Finance minister Mthuli Ncube said non-exporting businesses would pay 5 US cents per kilowatt/hour.

HIGH FUEL PRICES

The Confederation of Zimbabwe Industries (CZI) said several companies have closed due to the power cuts, while the Zimbabwe National Chamber of Commerce (ZNCC) said the power shortages cost industry up to $200 million a week.

“The whole situation is a disaster,” CZI president, Harry Ruzvidzo, said. “Our members are suffering and a number have already closed down and some scaled down.”

Fuel prices have gone up four times since the beginning of the year and the first increase in January sparked violent protests throughout the country. “The manufacturing and agriculture sectors have been the most affected by the power cuts,” ZNCC chief executive Christopher Mugaga said. “The economy is losing between $150 million to $200 million weekly in lost production and exports.”

The government last month removed import duties on solar energy accessories including batteries and cables, hoping this would reduce demand for on-grid electricity.

Energy Minister, Fortune Chasi, also said hotels would soon be compelled to install solar systems to reduce demand for electricity from hydro and thermal sources. The government says it wants the country to produce 1,575MW of solar power.

Read the original article on East African.

Post Views: 3,817
Tags: EconetStrive MasiyiwaZimbabweZimbabwe Electricity Supply Authority
Previous Post

Non-mining Environmental Permits Now Need Auditing

Next Post

Is Transmission, Solar the Answer to Connecting Africa?

Jimmy Swira

Jimmy Swira

Related Posts

Angola Opens International Mining Tender
Zimbabwe

Vast Resources Revises Agreement With Botswana Diamonds

November 29, 2019
Zimbabwe: ... Mortgages Gold to Pay Loans
Zimbabwe

Zimbabwe Mortgages Gold to Pay Loans

November 22, 2019
Zimbabweans Turn to Illegal Gold Mining
Zimbabwe

Zimbabwe: Homes, Land Destroyed As Desperate Zimbabweans Turn to Illegal Gold Mining

November 21, 2019
Zimbabwe to Slash Diamond Royalty to 10%
Zimbabwe

Zimbabwe to Slash Diamond Royalty to 10%

November 19, 2019
Thousands of Kilograms of Zim Gold Being Smuggled Into South Africa - Minister
Zimbabwe

Thousands of Kilograms of Zim Gold Being Smuggled Into South Africa – Minister

November 18, 2019
'Use It Or Lose It' Policy For Mining Assets
Zimbabwe

Zimbabwe To Enforce ‘Use It Or Lose It’ Policy For Mining Assets

November 14, 2019
Next Post
President Commissions Africa’s Largest Wind Power Project

Is Transmission, Solar the Answer to Connecting Africa?

Please login to join discussion
Follow Us
Twitter LinkedIn Facebook
About African Mining Brief
Contact Us
Careers
Advertise
Submit Article
Magazine Archive

© 2018 African Mining Brief - Powered & Designed by Marque Studio.

No Result
View All Result
  • Home
  • Events
  • Industries
    • Energy
    • Equipment
    • Fuel and Fleet Management
    • Legislation
    • Mining
    • Products
    • Technology
    • Water
  • People
  • Insights
  • Videos
  • Advertise
  • Magazine Archive
  • Blog

© 2018 African Mining Brief - Powered & Designed by Marque Studio.