Nigeria flags-of Construction of 614km Ajaokuta-Kaduna-Kano Gas Pipeline
The president of Nigeria Muhammadu Buhari has flagged-off construction of 614km Ajaokuta-Kaduna-Kano gas pipeline. The project, expected to be completed...
The president of Nigeria Muhammadu Buhari has flagged-off construction of 614km Ajaokuta-Kaduna-Kano gas pipeline. The project, expected to be completed...
Langer Heinrich Mine in Namibia has confirmed a US $81m of restart expenditure plan. The Restart Plan marks the completion...
Roxgold has announced that it has successfully executed documentation to refinance its existing Yaramoko Facility in Burkina Faso and secure...
Roxgold announced further infill and extension drilling results from the Ancien deposit at the Company’s Séguéla gold project located in...
Air Core Drilling has commenced at the Senala Gold Project, Senegal. According to Oriole Resources, a 10,000m air core ('AC')...
Tanzanian Gold Corp has announced that it has received a 43-101 Independent Technical Report entitled “Updated Mineral Resource Estimate for the...
Tanzanian Gold Corporation has announced that gold production has reached commercial level at the oxide ore processing plant at the...
AVZ Minerals Limited is further advancing its plans to develop the Manono Lithium and Tin Project (Manono project) in the...
Jubilee Metals Group has secured the rights to around 150mln tonnes of copper containing tailings to be refined at its...
The Board of Implats has elected not to exercise the current option arrangement to acquire up to 50.1% from the...
© 2018 African Mining Brief - Powered & Designed by Marque Studio.
© 2018 African Mining Brief - Powered & Designed by Marque Studio.