• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

March 16, 2023
Critical Steps to Mitigate Harmonic Distortion

Critical Steps to Mitigate Harmonic Distortion

March 20, 2023
Energising Mine Closure Through Renewables

Energising Mine Closure Through Renewables

March 17, 2023
advertisement
ADVERTISEMENT
Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

March 16, 2023
Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

March 16, 2023
New High-Performance Circle for Cat® 24 and 24M Motor Graders

New High-Performance Circle for Cat® 24 and 24M Motor Graders

March 12, 2023
Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

March 12, 2023
Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

March 12, 2023
Creating Intelligence in Oil and Gas

Creating Intelligence in Oil and Gas

March 12, 2023
Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

March 12, 2023
Multotec Celebrates 10 Years in Mozambique

Multotec Celebrates 10 Years in Mozambique

March 12, 2023
Signed Sealed Delivered – Mining

Signed Sealed Delivered – Mining

March 12, 2023
Maxiflex Launches Atmodoor 2.0 – Hinged on Local Innovation

Maxiflex Launches Atmodoor 2.0 – Hinged on Local Innovation

March 12, 2023
  • About AMB
  • Magazine Archive
  • Contacts
Tuesday, March 21, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Press Releases

Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

by African Mining Brief
March 16, 2023
in South Africa
0
Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine
494
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Schneider Electric and Alliance partner, 4Sight have seen their partnership go from strength to strength as the companies’ roll out various high-level projects that are testament to the adage strength in numbers.

Schneider Electric and 4Sight offer a winning formula with globally acknowledged products and entrenched skills. 4Sight’s Operational Technology team of nearly 100 engineers work closely together with Schneider Electric to develop tailored solutions that meet today’s bespoke customer requirements.

Plan for the Future, Yesterday

Schneider Electric and 4Sight have embarked on an exciting project at a prominent South African mining group that sees the partners implementing a Value Chain Optimisation (VCO) solution that includes AVEVA’s Production Management & Unified Supply Chain offering.

The project, which is earmarked for completion by November 2023, will replace the mine’s multi-layered and highly complex Excel-based supply chain environment with two components:

  • AVEVA Unified Supply Chain that plans up to two years into the future, optimising activities such as processing, logistics, inventories and product requirements and provision.
  • AVEVA Production Management that monitors current activities to track conformance to the optimised plans.

Read: New High-Performance Circle for Cat® 24 and 24M Motor Graders

“Combined, the two components will allow the mine to plan for future demand while making provision for activities that have not been completed or deviated from initial planning. The implemented solution therefore becomes a dynamic, repeatable, and predictive system that allows the customer to accurately manage its supply chain based on past and future information,” comments Charl Marais, OT Digital Transformation BU Manager at 4Sight.

“With the project, we’re providing the mine with a VCO solution that will allow it to accurately manage demand and supply, ensuring that the right material is in the right place without incurring unnecessary expenditure,” says Dr Suven M Ramsunder, Digital Transformation Expert at Schneider Electric

“As a practical example, due to fluctuating fuel costs, it might be more cost effective to use trucks (at certain times) to transport materials to the various ports as opposed to trains and vice versa,” adds Marais.

Information automated

The current Excel environment is highly complex and managed by a few individuals – a risk factor if one or more individuals are not available. By implementing the VCO solution, the mine will benefit from an automated system that is less reliant on human interaction.

Furthermore, the automated system mitigates human error such as finger trouble, which can cause havoc in a manual environment, thus delivering reliable information across the various systems on the mine’s sites.

This does not imply that people are not essential as Schneider Electric and 4Sight recognise that people are the lifeblood of an organisation. The aim of this solution is to enable the relevant personnel to be more efficient and effective in their duties without the added stress of a complex system.

A fully automated system also delivers answers in minutes and can be run frequently, unlike the current system, which delivers forecasting much slower and less frequently.

Schneider Electric’s products are vendor neutral, which means the VCO solution will integrate with the mine’s current systems, driving down costs in replacing existing equipment and overcoming interoperability challenges.

Ultimately, Schneider Electric and 4Sight aim to provide the mining group with an optimised supply chain to deliver on-time, reliable and actionable information, save on costs and enhance operations.

Tags: 4SightminingSchneider Electric and Alliance
Share198Tweet124Share49
African Mining Brief

African Mining Brief

Jan - March 2023 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In