• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
USE ON PAGE 17 ROCK BREAKER

Increasing Complexity Raises Bar for Rock Engineering

February 9, 2022
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Friday, February 3, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Equipment

Increasing Complexity Raises Bar for Rock Engineering

Prepared by: William Joughin, Chairman and Corporate Consultant (Rock Engineering); Ed Saunders, Principal Consultant - Mining Rock Mechanics; Diane Walker, Principal (Geotechnical Engineering)

by Dennis Ayemba
February 9, 2022
in Equipment
0
USE ON PAGE 17 ROCK BREAKER
493
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

With the world’s most accessible mineral deposits already discovered and developed, extraction conditions are becoming progressively more difficult – making rock engineering more demanding. In open pits, slopes are often required to be steeper, with increased production pressures. As underground mines deepen, there is growing risk of mining-induced stresses and rock bursts. Orebodies also tend to be geologically more disturbed, making them harder to mine.

Orebodies are often exploited from surface using low-cost open pit mining, but as the orebody continues deeper, waste stripping becomes excessive and underground mining is considered. The transition from open pit to underground is challenging. Many factors, such as the shape and size of the orebody, rock mass characteristics, geological structure, economics, underground mining methods, environmental constraints, management of water, surface infrastructure and impact on local communities need to be considered.

The decision to leave a crown pillar to prevent pit slope failure and subsidence or remove the crown and manage the failure impacts needs to be made at the very beginning. This decision also significantly affects the design of the access to the underground operation, which in turn affects the timing and cost of the transition. Rock engineering plays a major role in all decisions.

Among the underground mining methods available, block caving is often favoured wherever it is feasible, as its cost-effectiveness makes it possible to mine even low-grade deposits economically. However, it does require higher capital costs, including intensive upfront investigation and analysis. While some other methods provide opportunities to learn lessons as mining progresses, block caving is less forgiving – the correct strategies must be adopted from the start.

All this points towards the growing importance of rock engineering design and the various technical inputs that contribute to this complex field. This applies not only from an economic perspective, but equally from the point of view of health and safety as well as operational risk. More geologically disturbed environments present a higher safety risk, requiring greater engineering effort to execute the mine plan.

A comprehensive, integrated approach using a multi-disciplinary team is required, taking into account geological, geotechnical, structural and hydrogeological data. The interpretation of structures and rock mass is vital to anticipating hazardous conditions and can be incorporated into the mining strategies we recommend. The significant impact of water on the stability of pit slopes and underground excavations, especially in shallower operations, highlights the role of the hydrogeologist.

Read: Apply Proximity Detection System with Planning and Engagement

Analysis

Various methods of analysis are available. Complex numerical modelling can assist in quantifying failure mechanisms, for instance, while a quantitative risk evaluation approach can be used to estimate the impact of slope failure on a mine’s net present value.

The quality of the analysis is, of course, only as good as the quality of the data. The tools at our disposal to gather the necessary data are constantly improving. SRK makes the most of existing data to focus engineering works from an early stage.

Incorporating new technologies improves our investigation methods into rock mass conditions and allows data collection to be conducted remotely where access is unsafe or inaccessible. Some remote tools are also proving useful during the COVID-19 pandemic, when it is difficult to travel and to gain access to mine sites. LiDAR drone surveys have been employed to scan narrow-vein stopes before backfilling, for example. Bathymetric and three-dimensional sonar surveys have even been taken in a mine closed over 50 years ago, improving the spatial understanding of the mine workings themselves, as well as the quality of the rock mass and the stability of the excavation.

The data and analysis must lead to a practical solution, and here there is no substitute for experience. At the end of a complex analysis, the experienced engineer must understand the risks that have been quantified and mitigate these in a safe and cost-effective strategy. SRK can match the most appropriate team from its global network of consulting practices with the project deposit and operating conditions, including structural geologists, hydrogeologists and numerical modellers.

Tags: Rock EngineeringSRK Consulting
Share197Tweet123Share49
Dennis Ayemba

Dennis Ayemba

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In