• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
WEBA Steps in to Save Mine’s Endless Chute Worry

WEBA Steps in to Save Mine’s Endless Chute Worry

January 25, 2022
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Monday, January 30, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Press Releases

WEBA Steps in to Save Mine’s Endless Chute Worry

by Dennis Ayemba
January 25, 2022
in Press Releases
0
WEBA Steps in to Save Mine’s Endless Chute Worry

A sectional view of a cone crusher feeding through Weba’s crusher discharge chute onto a conveyor supported within its access structure.

491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

A primary crusher discharge chute had been a headache for a large Botswana diamond producer for many years. The crunch came when, after considerable capital expenditure, the new conventional chute needed maintenance just six weeks after installation.

“This could not continue and the mine needed a long term solution which is why we believe they came to us for a proposal,” says Hilton Buys, regional manager at Weba Chute Systems. “Senior experts from our company visited the site to take a careful look at the conditions the chute needed to deal with, and we took our conclusions back to our design office.”

Read: Booyco Stays at the Leading Edge of PDS Technology

The Challenges

Among the challenges were large lump sizes in the ore stream, contributing to build-up of material in the chute and regular choking, says Buys. Also, while Botswana’s dry season is long, the rain that does fall causes considerable problems to the flow dynamics. The kimberlite on the mine – depending on which part of the pit it comes from – can become very sticky in wet weather.

“We therefore had to pay particular attention to flow angles, and the design had to effectively accommodate both wet and dry conditions,” he says. The concept design – which included quick-release lips on dead boxes – was approved by the mine and the final design, manufacture and successful installation was conducted.

Adding to the complexity was that the feed end of the primary crusher was some eight metres below ground level, while the crusher itself stood about 10 metres tall. The chute had to be positioned below the rock box which stores the material from the crusher discharge, channelling the stream into the Weba chute at a transfer height of nine metres to the conveyor belt.

“The conventional chute also created excessive dust through uncontrolled rock velocity over this considerable transfer height,” he says. “By contrast, our chute’s controlled flow meant that the mine did not even have to apply its dust suppression system.”

After installation, Weba Chute Systems gave the customer a 12 month guarantee on this chute, as it does with all its new chutes. This, which comes with regular inspection reports, assures the customer that the performance will meet their expectations.

“These inspections allow us to monitor wear, so we can advise the customer on what action is required so that they can schedule maintenance and avoid unexpected downtime,” Buys says. Installed in 2017, the chute is still operating with little maintenance, having been delivered at a highly competitive price compared to the one it replaced.

“Designing a long lasting chute is not just about creating a box with some reinforcing where you think there will be wear,” he says. “It is an endeavour that must be scientific, based on in-depth analysis of material and flow conditions.”

Buys highlights the importance of asking a range of technical questions about the specific application so that the design answers those needs. The latest software and modelling tools are then applied by the Weba Chute Systems team to guide the most effective design.

Tags: Hilton BuysWeba Chute Systems
Share196Tweet123Share49
Dennis Ayemba

Dennis Ayemba

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In