• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
LNG-Liquefaction-Plant

Tanzania to Revive Long-Stalled US $30bn LNG Project in Lindi

April 9, 2021
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Friday, February 3, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Africa

Tanzania to Revive Long-Stalled US $30bn LNG Project in Lindi

by Dennis Ayemba
April 9, 2021
in Africa
0
LNG-Liquefaction-Plant
496
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

The newly sworn-in Tanzania President Samia Suluhu Hassan is set to revive the long-stalled US $30bn liquefied natural gas LNG project in Lindi Tanzania. The project was sidelined under the administration of the former President, the late John Pombe Magufuli with his administration instead prioritising the East Africa Crude Oil Pipeline to take oil from Uganda to the Tanzanian port of Tanga.

According to the President, she tried to work on the LNG project when she was sworn in as the vice president back in 2015 but discovered it was beyond her and stopped. Nevertheless, she has now directed the Ministry of Energy to accelerate talks with the project’s stakeholders, Shell and Equinor.

Read: Total Suspends Restart of Works at Mozambique LNG Project Amid Attacks

Tanzania LNG

Tanzania LNG would involve gas from Shell-operated blocks 1 and 4 and Equinor’s Block 2 being piped from deep-water subsea wells to two or three liquefaction trains at Lindi. These blocks house about 35 trillion cubic feet of recoverable gas, split about evenly between the two operators’ assets.

According to Shell, The offshore deepwater gas in the south of Tanzania is located in fields over 100km offshore, and some are in water that is up to 2,500m deep and 2,500m below seabed. Distance between the fields can also be over 100km apart. Depth, distance and terrain means the Tanzania LNG project is at the cutting edge of deep sea exploration technology and provides a unique opportunity for developing unique competencies and capabilities in the local supply chain and within TPDC as the project tackles these technical obstacles.

LNG is natural gas that has been cleaned and cooled in huge refrigeration units to a temperature of around -162oC. The LNG process converts the gas into liquid, substantially reduces the volume of the gas more than 600 times. This is similar to shrinking a football to the size of a marble. This makes the gas easier to store and transport safely to markets around the world in purpose-built ships.

Tags: East Africa Crude Oil PipelineJohn Pombe MagufuliSamia Suluhu HassanTanzania LNG
Share198Tweet124Share50
Dennis Ayemba

Dennis Ayemba

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In