• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
Mining

Vardocube granted EA for mining at Prieska Copper-Zinc Project in South Africa

March 11, 2020
Critical Steps to Mitigate Harmonic Distortion

Critical Steps to Mitigate Harmonic Distortion

March 20, 2023
Energising Mine Closure Through Renewables

Energising Mine Closure Through Renewables

March 17, 2023
advertisement
ADVERTISEMENT
Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

March 16, 2023
Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

March 16, 2023
Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

March 16, 2023
New High-Performance Circle for Cat® 24 and 24M Motor Graders

New High-Performance Circle for Cat® 24 and 24M Motor Graders

March 12, 2023
Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

March 12, 2023
Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

March 12, 2023
Creating Intelligence in Oil and Gas

Creating Intelligence in Oil and Gas

March 12, 2023
Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

March 12, 2023
Multotec Celebrates 10 Years in Mozambique

Multotec Celebrates 10 Years in Mozambique

March 12, 2023
Signed Sealed Delivered – Mining

Signed Sealed Delivered – Mining

March 12, 2023
  • About AMB
  • Magazine Archive
  • Contacts
Monday, March 20, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home South Africa

Vardocube granted EA for mining at Prieska Copper-Zinc Project in South Africa

by Dennis Ayemba
March 11, 2020
in South Africa
0
Mining
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Vardocube, a subsidiary of Orion Minerals, has been granted an Environmental Authorisation (EA) for mining by  the South African Department of Mineral Resources and Energy, over Vardocube’s portion of the flagship Prieska Copper-Zinc Project in South Africa.

According to Orion’s MD and CEO, Errol Smart, this marks another significant milestone in the company’s strategy to deliver a substantial new base metals mine at Prieska. “With the grant of the Environmental Authorisation and Mining Right for the bulk of the Prieska Mineral Resource secured in August last year, the grant of the the Vardocube EA represents the final step towards securing the Mining Right covering the south-eastern extension of the deposit,” he affirmed.

He further added that the award of this important authorisation is testament both to the commitment of the Orion leadership team to deliver this project and to the support of the South African authorities in facilitating new investment in a modernised mining sector.

Read: Zimbabwe to Withdraw Mining Titles of Fees Defaulters

Development of the Prieska Project

The granting of the Vardocube EA, which covers the south-eastern strike extension of the Prieska orebody, follows the grant in August 2019 of a Mining Right to Repli Trading No. 27 which owns the majority of the Prieska Copper-Zinc Mineral Resource. The granting also represents a major step towards the development of the Prieska Project and clears the way for construction to commence, following project financing.

Following the completion of the Prieska Project BFS in June 2019, Orion has been implementing optimisation studies and preparations for mine construction and securing project funding. The outcomes of the optimisation studies will be incorporated into updated operating plans to determine a final business case which will support the updated BFS Report, targeted for completion in early Q2 CY2020. This approach will ensure that the project execution incorporates as many improvements as possible, further de-risking the Prieska Project and providing the best financial outcome.

Tags: Orion MineralsPrieska ProjectVardocube
Share196Tweet123Share49
Dennis Ayemba

Dennis Ayemba

Jan - March 2023 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In