• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech

Can Mining Companies Currently Generate Own Power Without Licenses?

February 5, 2020
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Sunday, January 29, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home South Africa

Can Mining Companies Currently Generate Own Power Without Licenses?

by Dennis Ayemba
February 5, 2020
in South Africa
0

juwi has completed a 4 MW Single Axis Tracking PV installation at Gold Fields’ Agnew gold mine, in Western Australia.

493
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

By Jason van der Poel, Mzukisi Kota & Alexandra Felekis

On 3 February 2020, subsequent to the Minister of Mineral Resources and Energy, Gwede Mantashe’s, address at the 26th Investing in Africa Mining Indaba, a series of headlines appeared proclaiming that “mining companies can generate own power without licenses”. Several clients picked up the phone to our firm to ask: “is this true?”.

The relevant paragraph of the official written text of the Minster’s speech says: “Following concurrence by energy regulator, NERSA, we are in the process of gazetting a revised Schedule 2 of the Electricity Regulation Act; which will enable self-generation; and facilitate municipal generation options under “Distributed Generation”. This will help close the energy gap caused by deteriorating Eskom plant performance. Depending on the circumstances, the generation plant may only require registration and not licensing“.

The current regulatory context

The central piece of legislation regulating electricity in South Africa is the Electricity Regulation Act, 4 of 2006 (the ERA). Section 4 of the ERA grants the National Energy Regulator of South Africa (NERSA) various powers and duties in respect of the electricity regulation framework, including the consideration and issuance of generation, transmission, distribution and trading licences, and the regulation of tariffs.

Schedule 2 of the ERA sets out activities which are exempt from the obligation to apply for and hold a license. These activities must still be registered with NERSA. These activities currently are, in summary, the operation of a generation facility:

  • of no more than 1MW that is connected to the national grid, where there is a single customer, no wheeling of electricity through the national grid and the Minister has not published a notice in the Gazette stating that the amount of megawatts allocated in the IRP for embedded generation of this nature has been reached;
  • of no more than 1MW that is connected to the national grid, where there is a single customer, wheeling through the national grid and there is an allocation for that electricity in the IRP;
  • of no more than 1MW that is not connected to the national grid, where the operation is solely to supply the owner of the generation facility in question or for consumption by a customer related to the generator or owner of the generation facility on the same property where the generation facility is located (this category currently seems the most applicable to mines, except that mines would generally look to procure electricity generation capacity way in excess of 1MW, for example, some mining companies are looking to procure between 40 and 60MW of private generation capacity);
  • for demonstration purposes only, where the electricity produced is not sold and the facility will be in operation for less than 3 years; and
  • where the electricity is produced from a co-product, by-product, waste product or residual product of an underlying industrial process and where the operation is solely to supply the owner of the generation facility or for consumption by a customer related to the generator on the same property where the generation facility is located.

Section 34 of the ERA provides that the Minister may determine that new generation capacity is needed, the types of energy sources to be used, to whom the electricity may be sold and the manner in which the electricity is to be procured, for example through a competitive tender process and whether or not involving the private sector.

The Electricity Regulations on New Generation Capacity (New Generation regulations) were published in May 2011 (and amended in November 2016) apply to new generation capacity procured by organs of state only – so do not apply to self-generation by privately owned mines or industry.

The Integrated Resource Plan gazetted in October 2019 is South Africa’s plan for the procurement of generation capacity up to 2030. The last such plan was the Integrated Resource Plan 2010 (IRP 2010) promulgated in March 2011, and such plans are intended to be updated every two years.

Section 10(2)(g) of the ERA allows the Minister of Mineral Resources and Energy to grant deviations from the Integrated Resource Plan. In May 2019, Jeff Radebe, the previous Minister of Energy, wrote a letter to NERSA granting a deviation from the then extant IRP 2010-2030 for licensing the operation of generation facilities between 1 and 10MW. Now, the current Integrated Resource Plan does not cap the amount of distributed generation that may be produced up to 2022. From 2022 to 2030, it is capped at 500MW per year. Distributed generation in the current IRP refers specifically to projects between 1 and 10MW.

Can mining companies generate own power without licenses?

Currently:

  • if mining companies wish to generate own power less than 1MW, then they will need to register with NERSA;
  • if mining companies wish to generate own power greater than or equal to 1MW but less than 10MW, they can do so under the current IRP, but need to get licensed by NERSA;
  • if mining companies wish to generate own power greater than or equal to 10MW, they will need a Ministerial deviation from the IRP and to be licensed by NERSA. This could also be enabled through an amendment of schedule 2 of the ERA to exempt their intended generation facilities from the licensing requirement.

The Minister has now said that together with NERSA, his Department is in a process to gazette a revised schedule 2 of the ERA to enable self-generation and facilitate municipal generation options under “Distributed Generation”, as defined in the current IRP. Miners and industry can derive some encouragement from the Minister’s comments but should examine the detail of any legislative amendment that comes into being as a consequence of the Minister’s comments in order to be certain.

 Jason van der Poel, Mzukisi Kota & Alexandra Felekis are Partners at Webber Wentzel

Tags: Electricity Regulation Act 4 of 2006mining companiesNational Energy Regulator of South AfricaNersa
Share197Tweet123Share49
Dennis Ayemba

Dennis Ayemba

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In