• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
Foskor Contracts Geomec

Foskor Contracts Geomech Africa to Help Optimise Its North And South Pits

February 4, 2020
Critical Steps to Mitigate Harmonic Distortion

Critical Steps to Mitigate Harmonic Distortion

March 20, 2023
Energising Mine Closure Through Renewables

Energising Mine Closure Through Renewables

March 17, 2023
advertisement
ADVERTISEMENT
Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

March 16, 2023
Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

Dekra Institute of Learning Strengthened by Independent Examinations Board (IEB)

March 16, 2023
Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

Success in Partnership – Schneider Electric and 4Sight to Implement a Value Chain Optimisation Solution at SA Mine

March 16, 2023
New High-Performance Circle for Cat® 24 and 24M Motor Graders

New High-Performance Circle for Cat® 24 and 24M Motor Graders

March 12, 2023
Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

Celebrating Equal Opportunities: Three ABB South Africa Women Share Their Inspirational Stories

March 12, 2023
Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

Nearly 1,500 Tons of Drilling Material from the U.S. Up for Public Auction

March 12, 2023
Creating Intelligence in Oil and Gas

Creating Intelligence in Oil and Gas

March 12, 2023
Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

Edge Boxes and Industrial PCs – Driving Efficiency and Productivity at the Edge

March 12, 2023
Multotec Celebrates 10 Years in Mozambique

Multotec Celebrates 10 Years in Mozambique

March 12, 2023
Signed Sealed Delivered – Mining

Signed Sealed Delivered – Mining

March 12, 2023
  • About AMB
  • Magazine Archive
  • Contacts
Tuesday, March 21, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Press Releases

Foskor Contracts Geomech Africa to Help Optimise Its North And South Pits

by Matimu Mahundla
February 4, 2020
in Press Releases
0
Foskor Contracts Geomec
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Foskor is a producer and distributor of phosphate rock, phosphate-based fertilisers, sulphuric acid, phosphoric acid and magnetite locally and internationally. The company is South Africa based, with in excess of 1600 employees.

Foskor awarded Geomech Africa a contract to carry out a geotechnical investigation at its Mining Division is in the Limpopo Province of South Africa.

The image below shows a simplified geological map of the Phalaborwa Complex, with the mine located in the North.

Figure 1 Simplified geological map of the Phalaborwa Complex (from: Torsvik et al, 2011).

The current pit designs for Foskor’s north and south pits were based on very limited geotechnical data. This lack of data results in pit slope designs of low confidence. A geotechnical risk assessment and gap analysis of the South and North pyroxenite pits was carried out in 2010 and it was concluded that a number of oriented geotechnical boreholes should be drilled to ensure that there is sufficient discontinuity, rock mass and intact rock strength data to identify the continuity of the rock.

The main purpose of this drilling programme is to obtain sufficient geotechnical data for optimisation of the north and south pits. The project entailed drilling two holes in the North pit and five in the South pit. The holes which range from 300m to 500m deep are being drilled by LF90 Boart Longyear and CS1500 Atlas Copco rigs whose long reach booms are specially designed for exploration drilling.

Down the hole surveys are done at the end of each day to ensure that the direction of the holes does not deviate more than 2º from the required angle of -70º. The survey tool is connected to the overshot and dropped to the bottom of the hole to read the direction of the hole. Further, structural data comprising of structural identifications and their respective orientations is measured by means of Acoustic Televiewer, a down the hole geophysical method.

There are instances where the upper sections of the rock mass is highly fractured making the drilling and identification of strata more complex. The holes have had to be grouted in places to allow the drill to pass through larger cracks and specific drilling muds have been used in the production process to help prevent the collapse of unstable strata into the borehole and the escape of essential cooling and lubricating drilling muds into open cracks. The correct drilling muds were identified through a combination of experience and trial and error.

Drilling supervisor, Kiewiet Mahlangu has been in the exploration drilling division of Geomechanics for 14 years and using his knowledge, he tested various scenarios and their impact on the formations as the drill advanced, until the correct balance was found. The final solution involved Aus plug, Bentonite and CR650.

The contract lasted 3 months and was completed on time.

According to Nkosi Nene, Chief Rock Engineer at Foskor, “Our experience working with Geomech Africa has been a good and a professional one. Our working relationship and collaborative efforts and engagement has yielded good results and progress on the project and we are pleased thus far.”

Share196Tweet123Share49
Matimu Mahundla

Matimu Mahundla

Jan - March 2023 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In