• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech
Sibanye Plans New JSE-listed Holding Company

Over 3 000 Gold Mine Workers Affected By Sibanye-Stillwater Restructuring

June 5, 2019
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Friday, February 3, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home South Africa

Over 3 000 Gold Mine Workers Affected By Sibanye-Stillwater Restructuring

by Jimmy Swira
June 5, 2019
in South Africa
0
Sibanye Plans New JSE-listed Holding Company

Sibanye-Stillwater's Driefontein Mine

491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

By Lameez Omarjee, Fin24

Sibanye-Stillwater has concluded a section 189 process in its gold operations in South Africa which will affect over 3 000 workers.

The mining company on Wednesday issued a shareholder notice indicating that it had concluded a consultation process with relevant stakeholders about the retrenchments.

The company in February 2019 announced it would restructure its SA gold operations and associated services. The section 189 process was initiated due to financial losses at some of its Beatrix and Driefontein shafts since 2017.

At the time the mine expected over 6 000 workers, including contractors, would be affected.

Now that the process has been concluded, job losses have nearly halved. “Approximately 3 450 employees finally affected by the restructuring. Voluntary separation, early retirement  and natural attrition accounted for the bulk of the affected jobs, with forced retrenchments limited to approximately 800 employees and 550 contract workers,” the statement read.

“We have come through a difficult period, but have strategically positioned the group for the platinum wage negotiations and the integration of Lonmin. Restructuring and consultations proceeded despite the ongoing strike.

“We are therefore pleased to have concluded the S189 consultation and successfully reduced the footprint of the operations in a responsible manner and resulted in over 2 650 potential job losses being avoided,” CEO Neal Froneman said.

“Although restructuring is a difficult and emotive process, the sustainability of our remaining operations is our primary focus,” he added.

“We are now focused on restoring profitability at our SA gold operations in a steady and safe manner,” Froneman said.

The company stated that agreements had been reached with stakeholders. For example operations of the Driefontein 8 shaft will continue for as long as it makes a profit over a continuous period of three months. The shaft will provide extended employment for approximately 970 employees and 55 contractors.

“In the event that this operation becomes loss making again, it will be placed on care and maintenance with immediate effect,” Sibanye-Stillwater said.

Unfortunately, no “viable alternatives” were found for the Beatrix 1 shaft and Driefontein 2, 6 and 7 shafts, as well as the Beatrix 2 plant. “As such Beatrix 1 and Driefontein 2 shafts will be placed on care and maintenance, while Driefontein 6 and 7 shafts and Beatrix 2 plant will be closed,” Sibanye-Stillwater said.

Read the original article on Fin24

Tags: goldsection 189Sibanye-Stillwater
Share196Tweet123Share49
Jimmy Swira

Jimmy Swira

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In