• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech

Tanzania to Build the Largest Hydro-Power Plant in East Africa

December 12, 2018
Kleemann │ Interlinked PRO plant train impresses in the Caribbean

Kleemann │ Interlinked PRO plant train impresses in the Caribbean

January 27, 2023
EXPANDING THE VALUE PROPOSITION OF THE PDS

EXPANDING THE VALUE PROPOSITION OF THE PDS

January 19, 2023
advertisement
ADVERTISEMENT
2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

2023 to Usher in Strong Growth in Mining and Industrial Private LTE Networks

January 19, 2023

Wirtgen South Africa holds annual dealer conference

January 17, 2023
Eriez-India Granted ISO 9001:2015 Certification

Eriez-India Granted ISO 9001:2015 Certification

January 13, 2023

Eurasian Resources Group and the University of Kolwezi develop curriculum to meet mining skills demand in the DRC

December 13, 2022

Another successful turnkey modular construction and transit solution from thyssenkrupp Uhde delivered to a key customer

December 13, 2022
Epiroc to acquire leading provider of collision avoidance systems for mines

Epiroc to acquire leading provider of collision avoidance systems for mines

December 13, 2022
New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

New Cat® bolt-together buckets for underground loaders lower costs for assembly and transportation, reduce machine downtime

December 11, 2022

EPSA and Immersive Technologies Partner in Global Mining Workforce Development

December 11, 2022

THE JUNIOR INDABA 2023

December 11, 2022
Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

Atlas Copco and Reality Wellness celebrate their 20-year journey in putting employee well-being first

December 10, 2022
  • About AMB
  • Magazine Archive
  • Contacts
Monday, January 30, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Tanzania

Tanzania to Build the Largest Hydro-Power Plant in East Africa

by Jimmy Swira
December 12, 2018
in Tanzania
0

Tanzania President John Magufuli. Image: AllEastAfrica

491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

By Ludger Kasumuni

Dar es Salaam — Tanzania has made a landmark breakthrough in signing a contract for the US $ 2.83 billion worth largest hydro-electric power station in East Africa, overtaking Uganda which was leading in the bloc.

The colourful signing event took place at State House on Tuesday December 12 and witnessed by President John Magufuli alongside Egyptian Prime Minister Moustafa Madbouly.

The two leaders also exchanged notes on continuation of diplomatic co-operation to ensure that such a giant hydro-power project is constructed by the Arab Contractors of Egypt at the set time of 36 months.

Speaking during the signing ceremony, the minister for Energy, Dr MedardKalemani, said that in terms of magnitude the Stigler’s Gorge power station was set to be the fourth largest hydro-power station in Africa after the first one in Ethiopia, followed by Nigeria’s, another Ethiopian hydro-power and Tanzania’s Stigler’s Gorge which will produce 2,113 MW.

The fifth is the Aswan Dam with the hydro-power station producing 2,100 MW, according to him.

Under the global ranking of hydro-power stations and man made lakes or dams, the Stigler’s Gorge is at 60th position, while the largest is in China, followed by the one in Brazil and the third again is inChana, according to Dr Kalemani.

The size of the expected dam or man made lake at Stigler’s Gorge will be 35.2 billion cubic metres with a length of 1,025 metres and a height of 131 metres, according to Dr Kalemani.

He said the Arab Contractors will also build nine turbines with capacity to produce 2,113MW.

President Magufuli also clarified on the project size in relation to the composition of Selous Game Reserve, saying that it is very small part of not more than two percent of the largest game reserve in East Africa.

State House Presidential Directorate director GersonMsigwa, for his part, clarified that such project had come at the right time when the country has a vision of building an industrial economy with a plan of generating 5,000 MW come 2020 and 10,000MW by 2025.

Read the original article on Citizen.

Tags: Arab Contractors of EgyptEgyptian Prime Minister Moustafa Madboulyhydro-electric power stationPresident John Magufuli
Share196Tweet123Share49
Jimmy Swira

Jimmy Swira

Oct - Dec 2022 Magazine

  • About AMB
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In