• Latest
  • Trending
  • All
  • News
  • Business
  • Politics
  • Science
  • World
  • Lifestyle
  • Tech

Groenfontein Tin deposit project results released

June 20, 2016
ISO-Reliability Partners Champions the Benefits of Predictive Maintenance

ISO-Reliability Partners Champions the Benefits of Predictive Maintenance

March 30, 2023
BME Steps Up Global Growth with Joint Venture in Indonesia

BME Steps Up Global Growth with Joint Venture in Indonesia

March 29, 2023
advertisement
ADVERTISEMENT
Business Maverick Zunaid Moti Announces Departure from Moti Group

Business Maverick Zunaid Moti Announces Departure from Moti Group

March 29, 2023
Thyssenkrupp Uhde Expertise Extends the Life of Ammonia Tanks

Thyssenkrupp Uhde Expertise Extends the Life of Ammonia Tanks

March 29, 2023
Success Story: First Cut and Special Steels

Success Story: First Cut and Special Steels

March 29, 2023
IPR’s Dewatering Plan Saves the Day at Iron Ore Mine

IPR’s Dewatering Plan Saves the Day at Iron Ore Mine

March 28, 2023
Pilot Crushtec Recognised Again as Top Metso Dealer

Pilot Crushtec Recognised Again as Top Metso Dealer

March 28, 2023
Digital Industries (Pty) Ltd Signs an AVEVA Select Partnership Agreement to Grow Its Footprint in The East and West Africa Regions

Digital Industries (Pty) Ltd Signs an AVEVA Select Partnership Agreement to Grow Its Footprint in The East and West Africa Regions

March 28, 2023
Flexible Power Technologies Will Make Africa’s Energy Leapfrogging a Reality

Flexible Power Technologies Will Make Africa’s Energy Leapfrogging a Reality

March 22, 2023
Critical Steps to Mitigate Harmonic Distortion

Critical Steps to Mitigate Harmonic Distortion

March 20, 2023
Energising Mine Closure Through Renewables

Energising Mine Closure Through Renewables

March 17, 2023
Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

Senegal’s Emblematic 130 MW Malicounda Power Project Fully Operational

March 16, 2023
  • African Mining Brief
  • Magazine Archive
  • Contacts
Saturday, April 1, 2023
African Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
No Result
View All Result
African Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive
Home Laboratory Services

Groenfontein Tin deposit project results released

by Newton Mthethwa
June 20, 2016
in Laboratory Services, Tin
0
491
SHARES
1.4k
VIEWS
Share on FacebookShare on Twitter

Bushveld Minerals Limited (AIM: BMN), a diversified mineral development company with a portfolio of vanadium, titanium, iron ore, tin and coal assets in Africa, is pleased to present results from pilot-scale metallurgical test work and plant design at its Groenfontein Tin Deposit (“Groenfontein Deposit” or the “Deposit”) in Limpopo Province, South Africa. 

Highlights

The Groenfontein Deposit test work was intended to assess tin recovery on a plant-scale, gain insight into potential concentrate grades, and to fine-tune plant flow-sheet design parameters. The test work has delivered the following positive results:

·      Expected recovery using gravity concentration of over 70%, for grind sizes of -1 mm;

·      Achieved commercial concentrate grade of 74.59% SnO2 (cassiterite – equivalent to 58.75% Sn);

·      Plant design and flowsheet underway; 

·      Final costing underway to determine capital and operating expenditure requirements for mining and processing plant establishment, together with ancillary infrastructure; and

·      Results to be incorporated into an updated business model focusing on the smaller-scale, near surface high-grade tin targets near-term production.

Bushveld released a scoping study on the Groenfontein and Zaaiplaats deposits in September 2014, which envisaged a mining rate of 691,000 tons per annum at a head grade of 0.12-0.23% SnO2 to produce 610-1130 tons of refined tin metal per annum post smelting.

Pursuant to the 2014 Scoping Study, the Company decided to revise the development plan for the project to focus on mining the higher-grade zone of the Groenfontein and Zaaiplaats Deposits and processing it using a relatively simple gravity separation flowsheet to produce a saleable concentrate product. The scope revision was driven by the Company’s interest in executing a low capex near term production operation. The aim is to take advantage of a relatively buoyant tin market and establish Greenhills as a stand-alone tin asset.

In order to assess tin recovery parameters on a plant-scale, gain insight into potential concentrate grades, and to fine-tune plant flowsheet design parameters, a large (500 kg) sample of surface ore from historical workings at the Groenfontein Deposit was submitted for additional metallurgical test work at Peacocke & Simpson, minerals processing experts specialising in gravity recovery.

The results show that at a top size of 1 mm, >70% Sn recoveries are achieved for enhanced gravity concentration, less than 15% Sn is lost to tailings during spiralling, and shaking tables achieve at least 85% recovery, giving over 50% cumulative recoveries and a final concentrate grade of 74.59% SnO2 (58.75% Sn).

Consequently, a flowsheet has been developed for gravity separation, with crushing and screening and rod-milling to -1 mm. Material is concentrated via spirals and shaking tables to maximise recovery and SnO2 concentrate grade. The plant design envisages a 164,160 tpa operation producing up to 510 tpa SnO2.

The next step is to complete flowsheet design and mine-planning studies to determine mine capex and opex parameters, which will be incorporated in a revised financial model.  

Fortune Mojapelo, CEO of Bushveld Minerals, said: “The encouraging metallurgical results achieved support our view that high-grade cassiterite concentrates can be produced from the Groenfontein Deposit with relatively good recoveries. With recently updated plant capex and opex estimates at hand, we look forward to finalising infrastructure and mine cost estimates while continuing to focus attention on accelerating smaller-scale mine development and commissioning. The tin market has been particularly positive in a generally negative commodity environment with the tin price up 18% since the start of the year on supply constraints.”

Share196Tweet123Share49
Newton Mthethwa

Newton Mthethwa

Jan - March 2023 Magazine

  • African Mining Brief
  • Magazine Archive
  • Contacts

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
  • Magazine Archive

© 2022 African Mining Brief I All Rights Reserved Powered by Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In