• Latest
  • Trending

Air-cooled overbelt magnets

March 5, 2015
Installation of Refrigeration and Air-cooling systems for Venetia Diamond Mine Underground Project Completed

Installation of Refrigeration and Air-cooling systems for Venetia Diamond Mine Underground Project Completed

August 12, 2022
Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution

Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution

August 12, 2022
Prisma Helps Change Narrative on Gender Bias in the Mining Sector

Prisma Helps Change Narrative on Gender Bias in the Mining Sector

August 11, 2022
Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey

Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey

August 11, 2022
Micromine Signs 3-Year Micromine Pitram Software Solution Agreement with AngloGold Ashanti

Micromine Signs 3-Year Micromine Pitram Software Solution Agreement with AngloGold Ashanti

August 10, 2022
The Economics of Workplace Safety

The Economics of Workplace Safety

August 10, 2022
Govt’s Energy Action Plan Sends a Strong Message to Industry and Investors

Govt’s Energy Action Plan Sends a Strong Message to Industry and Investors

August 8, 2022
Golden Age for Africa’s National and Regional Energy Transition

Cummins Offers Ideal Power Ecosystem for Independent Power Producers

August 5, 2022
Female Drill Rig Operators Pave Way at Kumba Iron Ore

Female Drill Rig Operators Pave Way at Kumba Iron Ore

August 5, 2022
SAIW Champions Africa School of Nuclear Power Excellence

SAIW Champions Africa School of Nuclear Power Excellence

August 4, 2022
Exxaro Welcomes New Partnership With YES Programme To Achieve Maximum Impact

Exxaro Welcomes New Partnership With YES Programme To Achieve Maximum Impact

August 4, 2022
The Green, The Bad and The Ugly: The Risks of Greenwashing

The Green, The Bad and The Ugly: The Risks of Greenwashing

August 3, 2022
Africa Mining Brief
No Result
View All Result
  • Login
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
MAGAZINE ARCHIVE
ADVERTISE
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
No Result
View All Result
Africa Mining Brief
No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases
Home Company Profiles

Air-cooled overbelt magnets

gap by gap
March 5, 2015
Reading Time: 2 mins read
0

AIR COOLED OVERBELT MAGNET SHORT PIC 2

RELATED POSTS

Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution

Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey

Exxaro Welcomes New Partnership With YES Programme To Achieve Maximum Impact

MULTOTEC’S HIGHLY SKILLED EXPERTS HELP CUSTOMERS LOOK BEYOND THE ONE-SIZE-FITS-ALL OPTION

A key differentiator for Longi-Multotec in the marketplace is having highly skilled and experienced experts on hand. “It is important to work with an original equipment manufacturer that understands the system parameters and is able to see past the one-size-fits-all option that has been the tendency in the past,” Willem Slabbert, process and applications engineer at Multotec, says.

An example of this expertise in action is the introduction of the latest developments in air-cooled overbelt magnets to the African mining industry. Multotec’s new range of standard range Longi-Multotec air cooled overbelt magnets is capable of operating in an ambient temperature of up to 45°C. “However, in specific instances where a more customised approach is called for, Multotec can size the correct magnet from its range of forced cooled magnets,” Slabbert points out.

The standard range conforms to the standard conveyor widths used in the African mining industry with international standard widths also available. There are four models available for each conveyor width. While the conveyor belt dimensions remain the same for all these model variants, the difference lies in the coil height, which can be raised in order to increase the strength of the magnet.

“Depending on the process parameters, we will decide which one of the four model variants is the most applicable. “This gives Multotec the necessary flexibility to be able to carry out custom selections for specific applications, which depends on the tramp metal that needs to be removed,” Slabbert explains.

The Longi-Multotec air-cooled overbelt magnets represent a step change in this critical technology. They incorporate a split coil design, whereby heat is dissipated over ten different surfaces compared to conventional technology’s six surfaces, making this cooling method far more efficient in terms of the overall system. “We are now able to offer this innovative technology to the African mining industry through our agreement with Longi,” Slabbert says.

ADVERTISEMENT

“By means of this technology we have completely eliminated the use of fans or forced cooling. This lack of forced cooling, along with the improvement in natural convective heat transfer, adds to the safety and efficiency of the equipment,” Slabbert says. The trend towards larger and faster travelling conveyors in the African mining industry has highlighted the vital role of overbelt magnets.

Another feature of the latest range of air cooled magnets is the circular shape of the magnetic coils and magnetic field distribution. Slabbert explains that circular magnets offer attraction gradients in all directions including the main conveyor travelling direction, whereas conventional rectangular magnets only offers attraction gradients in the perpendicular plane.

“The advantage of a gradient in the conveyor travelling direction is that these attractional fields assist in slowing down fast moving tramp metal, thereby increasing the residence time under the magnet and ultimately increasing extraction efficiency. This technological advantage is more predominant in fast moving conveyor systems like overland conveyors that can run up to speeds of six metres per second,” Slabbert concludes.

 

 

ShareTweetPin
gap

gap

Related Posts

Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution
Press Releases

Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution

August 12, 2022
Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey
Press Releases

Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey

August 11, 2022
Exxaro Welcomes New Partnership With YES Programme To Achieve Maximum Impact
Press Releases

Exxaro Welcomes New Partnership With YES Programme To Achieve Maximum Impact

August 4, 2022
ABB to Display its Sustainable Solutions at MINE-ENTRA 2022 in Bulawayo
Press Releases

ABB to Display its Sustainable Solutions at MINE-ENTRA 2022 in Bulawayo

August 3, 2022
Wits GIS Course Prepares Mining Professionals for Future Workforce
Press Releases

Wits GIS Course Prepares Mining Professionals for Future Workforce

August 1, 2022
Blasting Science Takes Another Digital Step
Commentary

Blasting Science Takes Another Digital Step

July 29, 2022
Next Post

Handover of model stope to Wits School of Mining Engineering

Agbaou Gold Mine project generates significant jobs

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

April – June 2022 Magazine

Installation of Refrigeration and Air-cooling systems for Venetia Diamond Mine Underground Project Completed
Mining News

Installation of Refrigeration and Air-cooling systems for Venetia Diamond Mine Underground Project Completed

by Dennis Ayemba
August 12, 2022
Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution
Press Releases

Sandvik Launches AutoMine® Mapping Solution, Next Generation Automation Solution

by Dennis Ayemba
August 12, 2022
Prisma Helps Change Narrative on Gender Bias in the Mining Sector
Commentary

Prisma Helps Change Narrative on Gender Bias in the Mining Sector

by Dennis Ayemba
August 11, 2022
Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey
Press Releases

Level 1 B-BBEE is Big Step in FLSmidth’s Transformation Journey

by Dennis Ayemba
August 11, 2022
Micromine Signs 3-Year Micromine Pitram Software Solution Agreement with AngloGold Ashanti
Mining News

Micromine Signs 3-Year Micromine Pitram Software Solution Agreement with AngloGold Ashanti

by Dennis Ayemba
August 10, 2022
Africa Mining Brief

© 2021 African Mining Brief - Powered By Clivo.

Navigate

  • About AMB
  • Advertise
  • Announcement
  • Media Kit
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • News
  • Events
  • Industry
  • People
  • Projects
  • Press Releases

© 2021 African Mining Brief - Powered By Clivo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In